San Pedro port Information
Located on the west side of the Ivorian coastline at 9 °
32 north latitude and 6 ° 29 west longitude (4 ° 51 'N 6 ° 42' W / 4.85, -6.70)
San Pedro Port is located on the Atlantic Ocean in the Guinea’s Gulf ,
at 170 nautical miles from Abidjan the economic capital of Côte
d’Ivoire. This port is presented as "the 2nd pole of development of Côte
d'Ivoire" , and specialized in exporting agricultural products such as
coffee and cocoa. San port harbor is considered as the world first cocoa
exporting harbor.
ENTRANCE RESTRICTION
If exceeding the indicated drafts (12 meters), harbor Master should be
informed one hour prior vessel arrival on roads. Pilotage: Compulsory
Towage: Compulsory (01)
Kotibe: IMO Number: 7211177; Power Voltage: 100 V;Total Power (kW):1988 kW;
Total Power (HP):2700 HP; Speed: 12.3 kn
Diameter of drill:
450 m. Liner of 220 meters with engines propulsion. Draught is
calculated on level 0./ Water density: 1.027 (rainy season: as 1.014). /
ISPS: Level 1 / Weather: Heavy rainy season: May-July / Light rainy season: October-November
ARRIVAL DOCUMENTS AND OTHER DOCUMENTS
Isps code pre- arrival information are required from vessel at least 48hr prior arriving
ARRIVAL ADVICE | D) SHIP'S DETAILS Vessel Name / Port of Registry / Call Sign / IMO Number / Ship Agent / Type of Vessel / ETA & date / ETA draft E) VOYAGE DETAILS Day, Month and Time the report is made / Last Port of Call / Next Port of Call F) SECURITY DETAILS Security level the vessel is operating / Name and Rank of the Ship Security Officer (SSO) / Name of Company Security Officer (CSO) / Contact Details of CSO / Crew List / Passenger List / List of any other person on board. F) DESCRIPTION OF CARGO Cargo / IMDG Classes of Cargo on Board / Hazardous Cargoes / ***Port must be informed if the security level has been changed all in the last 30 days*** G) PRIOR ARRIVAL: ISPS pre- arrival data sheet / Ships Particulars / Crew list passport / Draft arrival conditions / Stowage Plan / Dangerous Cargo Declaration including storage situation / Crew list / Sea Man Book / Arrival displacement in tons / Load rate while de-ballasting in barrels per hour / Maximum load rate barrels per hour |
DOCUMENTS REQUIRED ON ARRIVAL |
Maritime Declaration of health / Vaccination List / Crew List / Narcotics List / List of ports called / Arms & Ammunitions Nil list / Passports / CDC of All Crews / Register of Entrance / Last Port Clearing / Bonded store list / Crew Effects List / Ship Certificate list / Chief Engineer Certificate / Master Certificate / Dangerous Cargo / Ships Particular / Cargo Declaration |
BERTH DESCRIPTION
berth reference number and Description | Length (m) | Draught (m) |
1 South quay - all cargo | 151 | 8.2 |
2 West quay - all cargo | 585 | 10.2 |
3 Service quay - only for tug boat | 104 | 3.5 |
4 Cement quay | 200 | 10.1 |
5 Timber quay | 160 | 4 |
01 Grain berth: with private handling equipment (evacuator approx 50T/h)
Dry dock and repairs/ workshop: Not available
SUPPLIES
- Fresh Water : Available, at berths only (by pipe connection)
- Bunkers : Available, by trucks (MDO)
- Provision / stores and others : Available, by private companies
- Hospital : Available for small treatments. Abidjan at one hour flight for emergencies.
Technical and Commercial Port information:
- Deep-water port, accessible 24/24 H , protected by two jetties of 145 m and 265 meter length
- Access channel dredged to -13.5 m, 650 meters as length and 150 meters as wide, with an air draft through unrestricted direct sea access
- Lake of 33 Ha with a turning circle of 450 meters in diameter and a draft of 11 meters
- 9 to 12 m draft at dock
- 10 ha of paved medians bonded
- A cold room of 3,000 m2 ? An underground pipeline for palm oil (250 t/ h)
- A complete system of lighthouses and beacons
- A sheet pile wharf of 160 meters length,
- 50 meters length of quay for fishing boats based at - 3.5 meters and 110 meters of quay for boats based at - 2.5 m
- Unloading shed (592 sqm.) and sales (360 m²)
- An ice factory of 151 square meters of production capacity of 10 / day and storage capacity of 20 tonstons
- A cold storage capacity of 8 tons at - 5 ° c.
Main storage capacities in Commercial port
Bonded warehouses |
13,800 sqm |
Bonded storage area
Container storage area |
10 ha |
Plugs for reefer containers |
100,000 sqm 10
|
Cement quay |
1 |
Pipeline underground |
250 t/h |
PORT HANDLING MATERIAL
Quantity | Capacity | |
Trucks | 75 | 20 – 40T |
Forklifts | 7 | 12 T |
Forklifts | 108 | 3 T - 7 T |
Forklifts | 2 | 20 T |
Challengers | 8 | 45 T |
Spreader | 11 | 20' - 40' |
Trailers | 104 | 20' - 40' |
Tugs | 1 | 2700 Hp |
Barges | 3 | |
Launches | 4 | |
Shore crane | 2 | 25 T - 60 T |
Fishing port information
With a total area of 18,727 m2, the fishing port disposes of infrastructure and superstructure to accommodate trawlers and motorized canoes.
The fishing port is composed of:
- A 300 m2 office building, housing both the services of the Port and the Aquaculture and Fisheries Department of Animal Production.
- An access channel 300 meters long, 30 meters wide and a draft of - 4 m
- A sheet pile wharf of 160 meters with 50 meters of wharf for fishing boats based in - 3.5 meters and a 110 meter quay for boats based on - 2 meters.
- An area of 600 m2 for net repair
- A water tower of 8 meters high, with a freshwater tank of 5 T and an administrative building of 300 m2
- A hangar landing of 500 m2
- A sales areaof3200m2forfish fully equipped
- Twocoldstorageandconservation areas of fishery products
OTHER RESTRICTIONS
Official Working Hours: 07 h30/ 12h00 – 14h30 / 19h00
Over time : 12h00- 14h00 / 19h00 – 07h00
Rains periods : June -August
Local Currency : 1 Euro = XOF 655.957
Special Regulation: Vessels carrying IMCO Class 7 are prohibited to enter into port.
HOLIDAYS IN IVORY COAST
01/11 : All Saints day
15/11 : Peace day
25/12 : Christmas day
01/01 : New Year’s Day
01/05 : Labor day
07/08 : independence Day
15/08 : Assumption day
15/06 : Ascent day
Easter day : As per Christian calendar
Pentecost day : 40 days after Easter day
During Christian/Muslim holidays, it is difficult to have gangs for day time. Therefore Owners /Charters are requested to inform stevedores earlier to get prepared.
DISCHARGING /LOADING RATE
Discharging | Loading | |
GENERAL CARGO | 200 MT/Gang | 200 MT /Gang |
BAGGED CARGO (LOOSED BAG) | 1000 MT /Shift | |
STEEL PRODUCTS | 300-400 MT/Gang | |
PALLETIZED | 300-400 MT/Gang | |
COTTON | 150 MT/H | |
TIMBER | 150 MT/H | |
CONTAINER CARGO(Over deck RO-RO/ Other container Vessel) | 25 TC /15tc / H | 15Tc / 10 Tc/ H |